PROJECTS

Mk3, 2010

The Mk3 Pre-Commercial was a 1/3 scale device that is identifiably similar to the fully commercial blueWAVE design

 


 

The Mk3PC is believed to have been the first of its size in Australia, and in the world, to be grid connected. The unit was installed at Port Kembla on 26 February 2010, about 100 metres off the eastern breakwater of Port Kembla Harbour.

 

The unit was designed for a short life and to serve the specific purpose of verifying the performance in open ocean conditions. The unit was deployed for three months and operated successfully, providing grid quality power to Integral Energy. It exceeding expectations and validated the ability of the full scale blueWAVE design to be rated at 2.5 MW.

 

 

Ali Baghaei and Australian Federal and State MPs including The Honourable Peter Garrett at the Offcial Launch

 

 

The official launch of the MK3PC project took place on 29 March 2010 in Port Kembla and was attended by a variety of dignitaries, including four Australian Federal and State MPs. The plaque commemorating the event was unveiled by The Honourable Peter Garrett, Federal Minister for Environment Protection, Heritage and the Arts, Commonwealth of Australia.

Other Projects

MK1 / MK2